|
AC (≤22 kW)
par kWh
|
DC (22.01–74.99 kW)
par kWh
|
DC (≥75 kW)
par kWh
|
|
|---|---|---|---|
Plenitude On The Road |
0.50 |
0.65 |
0.70 |
Swiss CHF/kWh lines on the official German tariff page. No subscription. Post-charge idle fees apply after 60 free minutes: Quick 0,12 EUR/min (except 23:00–07:00), Fast 0,20 EUR/min, Fast+/Ultra Fast 0,30 EUR/min (24 hours). These fees are automatically converted to local currency; no fixed CHF/min rate is published, so numeric idle components are omitted. AC sockets on DC stations follow the hosting station tariff. Power bands approximate infrastructure classes; verify the station price in the app. Personal coupon promotions are excluded. No fixed validity dates are published.
Jūsu Plenitude On The Road dalība darbojas par tādām pašām cenām pie šiem operatoriem
Cenu dati ir publiski pieejama informācija, kas apkopota tikai salīdzināšanas nolūkos.
Atjaunināts Novembris 2026
Uzlādes staciju dati: Bundesamt für Energie BFE / ich-tanke-strom.ch