|
AC (≤22 kW)
per kWh
|
DC (≥22.01 kW)
per kWh
|
DC (50–50 kW)
per kWh
|
DC (100–100 kW)
per kWh
|
DC (300–300 kW)
per kWh
|
|
|---|---|---|---|---|---|
|
MRA-E (AC concessions 2–5 / DC)
|
0.50 |
0.54 |
— | — | — |
|
AC — Gemeente Utrecht
Rajoitettu
|
0.46 |
— | — | — | — |
|
AC — Gemeente Utrecht - Dynamische tarieven**
Rajoitettu
|
0.41min
0.46avg
0.51max
|
— | — | — | — |
|
AC — Gemeente Amsterdam
Rajoitettu
|
0.44 |
— | — | — | — |
|
AC — MRA-E 6***
Rajoitettu
|
0.36 |
— | — | — | — |
|
AC — MRA-E 6*** - Dynamische tarieven**
Rajoitettu
|
0.34min
0.35avg
0.36max
|
— | — | — | — |
|
AC — Provincie Friesland
Rajoitettu
|
0.41 |
— | — | — | — |
|
DC — Gemeente Amsterdam
Rajoitettu
|
— | 0.61 |
— | — | — |
|
DC — Gemeente Den Haag
Rajoitettu
|
— | 0.71 |
— | — | — |
|
DC — Gemeente Rotterdam
Rajoitettu
|
— | 0.68 |
— | — | — |
|
DC — Gemeente Utrecht
50kW
100kW
300kW
Rajoitettu
|
— | — | 0.72 |
0.86 |
0.86 |
|
DC — Deudekom
Rajoitettu
|
— | 0.76 |
— | — | — |
|
DC — Roosendaal
Rajoitettu
|
— | 0.74 |
— | — | — |
Representative regional rates, not network-wide. MRA-E 6 and dynamic contracts have separate tiers.
TotalEnergies Netherlands-jäsenyytesi toimii samoilla hinnoilla näillä operaattoreilla
Hintatiedot ovat julkisesti saatavilla olevia tietoja, jotka on kerätty vain vertailutarkoituksiin.
Päivitetty Lokakuu 2026