|
AC (≤22 kW)
per kWh
|
DC (22.01–74.99 kW)
per kWh
|
DC (≥75 kW)
per kWh
|
|
|---|---|---|---|
Plenitude On The Road |
0.50 |
0.65 |
0.70 |
Swiss CHF/kWh lines on the official German tariff page. No subscription. Post-charge idle fees apply after 60 free minutes: Quick 0,12 EUR/min (except 23:00–07:00), Fast 0,20 EUR/min, Fast+/Ultra Fast 0,30 EUR/min (24 hours). These fees are automatically converted to local currency; no fixed CHF/min rate is published, so numeric idle components are omitted. AC sockets on DC stations follow the hosting station tariff. Power bands approximate infrastructure classes; verify the station price in the app. Personal coupon promotions are excluded. No fixed validity dates are published.
Your Plenitude On The Road membership works at the same pricing at these operators
Pricing data is publicly available information collected for comparison purposes only. It does not constitute a legally binding offer.
Updated November 2026
Charging station data: Bundesamt für Energie BFE / ich-tanke-strom.ch